Our
Installations
A selection of our completed installations across the Midlands and wider Leinster — from bridges and rotary parlours to community facilities and cattle underpasses.
Construction and installation of precast bridge beam structure and concrete abutments, including groundworks and crane-assisted placement.
Base to 80 Point Rotary Parlour
Design and installation of a modern 80-point rotary milking parlour, from base works through to the fully fitted rotary deck for high-throughput dairy operations.
Installation of a multi-purpose GAA wall ball court and community sports facility for the club, built for year-round hurling and football training.
Dairy Project — Edenderry
A full dairy installation including sheds, milking infrastructure and holding yards, engineered to withstand the demands of modern dairy farming.
Large Scale Project — Athy
A large-scale multi-phase construction project completed in Athy, captured by drone to show the full scale and complexity of the installation.
Comprehensive agricultural and dairy development in Edenderry, including groundwork excavation, reinforced circular base construction, modern portal-frame housing, and complete rotary milking parlour installation.
Public Road Underpass — Walsh Island
Installation of a precast concrete cattle underpass at Walsh Island, allowing safe movement of livestock beneath an adjoining road with minimal disruption. Works include road excavation, reinforced box culvert placement, utility ducting, backfill, and final road resurfacing.